Call us 0208 950 9070

Tanking treatment in Central London

Office Block in Central LondonExtensive tanking work has just been completed at a large office block in central London. This property was undergoing refurbishments so Kenwood’s worked closely with on-site contractors and installed our SWS tanking to prevent moisture ingress within the lower ground floor of the building. In order to achieve this we used our specially formulated cementious tanking system to create an impervious barrier against damp. Following the application of the tanking system these walls were then rendered using our specialist waterproof rendering system providing further protection. To finish the treatment we applied a final skim coat to the walls to leave them ready for re-decoration in 3-4 weeks’ time once the plaster has started to dry out.

Latest jobs

Damp proofing in South West London

Kenwood Plc were called out to an impressive terraced home in South West London. The property, built in the early 1900’s, ...

Damp Proofing in St Albans

Damp Proofing treatment just completed to a tenanted home in St Albans. Rising damp was found to be affecting walls within the...

Damp Proofing and Tanking treatment in Newham

Kenwood was called to a mid-terrace house in East London following concerns over dampness affecting the rear of the home. ...