Call us 0208 950 9070

Tanking treatment in Central London

Office Block in Central LondonExtensive tanking work has just been completed at a large office block in central London. This property was undergoing refurbishments so Kenwood’s worked closely with on-site contractors and installed our SWS tanking to prevent moisture ingress within the lower ground floor of the building. In order to achieve this we used our specially formulated cementious tanking system to create an impervious barrier against damp. Following the application of the tanking system these walls were then rendered using our specialist waterproof rendering system providing further protection. To finish the treatment we applied a final skim coat to the walls to leave them ready for re-decoration in 3-4 weeks’ time once the plaster has started to dry out.

Latest jobs

Damp Proofing and Tanking to Luton’s Wardown Park Museum

Wardown house was built in the 1880’s but it wasn’t until 1931 that it became a museum, due to the campaigning of Thomas ...

Condensation solution in Crawley

This project involved tackling a condensation problem in a flat in Crawley. Kenwood were contacted by the agents managing the ...

Rising damp treatment to Almshouse in Waltham Cross

Almshouses have a history dating back to medieval times, the oldest foundation still going, dates back to circa 990. ...