Dry Rot eradication in Northwood
Rot Treatment / Completed: 2 May 2015
Treatment for this extensive outbreak required the removal and destruction of flooring timbers and joinery along with the removal of wall plaster. Following this removal, the exposed brickwork is then irrigated by drilling the masonry and injecting a fungicidal preservative. The oversite was then sterilised to eradicate the fungal spores. The floor void could not be adequately ventilated and therefore the floors were replaced with concrete.