A builder renovating this empty 1900s end-of-terrace called us in once the old plaster was off. The bare brick in both reception rooms was stained and damp, and they wanted a lasting fix before the house was finished.
Our surveyor found high moisture readings on every wall of both reception rooms: the party wall, the flank wall, the bay, the chimney breast and the wall to the kitchen.
High readings at the base of the wall, taken during the survey.
The cause was twofold. External render and a plinth had bridged any original damp-proof course, allowing moisture to bypass it and rise up the walls. The ground outside also sits higher than the floor inside, so damp was pushing in sideways too.
The bathroom wall was damp as well, but that looked like a leak under the bath. We recommended a plumber rather than quoting for work we didn’t think was needed.
Our own team was on site from late July to mid-August.
1. A new damp-proof course. We drilled the mortar bed at the base of each wall and pressure-injected Kenwood siliconate fluid through the full 9-inch depth. Along the side passage we injected from outside as well. Where treated walls meet untreated ones, we added vertical damp-proof courses.
2. Tanking the walls. Because the ground outside is high, a damp-proof course alone wouldn’t stop damp pushing in sideways. We coated the lower walls with Kenwood SWS cementitious tanking to form a waterproof barrier.
3. Waterproof floors. We broke out about 32 square metres of old screed across both rooms. We tanked the concrete slab, linked it to the wall tanking, and laid a new waterproof screed on top.
4. Replastering. We rendered the walls, up to 2.4 metres in places, with Kenwood’s factory-mixed waterproof render. It contains salt inhibitors that stop old ground salts spoiling the new finish. We then skimmed the walls ready for decorating.
Waterproof render going on over the tanking.
Both reception rooms now have dry, freshly plastered walls and a level, waterproof floor ready for the builder’s finishes. The rising damp is covered by our 20-year written guarantee and the tanking by a 10-year guarantee.
Front bay: before and after.
Rear reception chimney breast: before and after. The stove was previously fitted by the builder.
The new waterproof screed, ready for floor finishes.
Look for a tide mark of staining up to about a metre high, and paint or wallpaper peeling at the bottom of the wall. White, fluffy salt deposits on the plaster and skirting boards going soft are other giveaways. It’s usually worst on walls that touch the ground outside.
Book a survey · Read more about damp proofing and structural waterproofing · More damp proofing projects
We use strictly necessary cookies to make our site work. We’d also like to set optional cookies to improve performance, provide enhanced functionality, and help with analytics and advertising. You can accept all cookies, reject all optional cookies, or review your choices.
We respect your privacy, so you can choose to disable certain types of cookies. Select each category to learn more and adjust the default settings. Please note that blocking some cookies may affect how the site works and the services we can provide.
These cookies are essential for the website to function and cannot be switched off.
Help us understand how our site is used (e.g., analytics) to improve your experience.
Enable enhanced functionality and personalization (e.g., chat widgets, video players).
Used to deliver advertising more relevant to you and your interests.